Our Projects

West Quarna 1 Oilfield
Electrical Infrastructure Installation
Client Name ExxonMobil
Project Location WQ1
Category Completed Project
Current Progress Completed 100%
Completion Date 2020

Zubair Oilfield Development Project
Installation of Piping and Pipeline
Client Name ENI/ZFOD
Project Location Zubair Oilfield, Basrah
Category Completed Project
Current Progress Completed 100%
Completion Date 2020

CPF Phase 2 Badra Oilfield
Mechanical,Electrical,Insrtrumentationa and Piping works at Badra Oil Field
Client Name Samsung/GPNB
Project Location Badra Oilfield—Waset—Iraq
Category Completed Project
Current Progress Completed 100%
Completion Date 2020

Provision of General Construction Consultancy Services
Provision of general construction consultancy services to the Rumaila supply base, in Iraq
Client Name Bp Iraq N.V
Project Location North Rumaila/ Basra/Iraq
Category Completed Project
Current Progress Completed 100%
Completion Date 2020

Operation and Maintenance Contracts for Badra Oilfield
1. Provisions of competent, experienced and a professional manpower and equipment/vehicle as further described in this scope of service to support:
• Pre commissioning
• Commissioning
• Maintenance
• Shutdown activities
• Scaffolding Services
Client Name Petrofac International (UAE) LLC .
Project Location Badra Oilfield—Waset—Iraq
Category Completed Project
Current Progress Completed 100%
Completion Date 2020

Slug Catcher Project _NR-Basra-Iraq
Hvac Works For Control & Substation Buildings :Supply And Install Galvanzied Steel With Corosion Resistance Coating And Insect Screen, Galvanized Steel Frame, Blade & Accesoreis. Stainless Steel Frame, Blade & Accessories, Low Leakage Type, Amca Class Ii (Min.)
Client Name CCC/Shell
Project Location North Rumaila/ Basra/Iraq
Category Completed Project
Current Progress Completed 100%
Completion Date 2019

Slug Catcher Project _NR-Basra-Iraq
Electrical and Instrumentation Work (Cable laying,Cable tray & Cable support Installation,cable termination,Instumentation Works)
Client Name CCC/Shell
Project Location North Rumaila/ Basra/Iraq
Category Completed Project
Current Progress Completed 100%
Completion Date 2019

(modular Building Installation Iraq West Qurna I) Mod075
Installation of prefabricated steel structural buildings for LCR ,LER ,Gurd House and four guard towers each one consist of three stories.
The project is located in WQ1, the work includes but not limited steel structure installation, electrical work, cable try installation, HVAQ system installation, G&F system.
Client Name Sajer / Saipem
Project Location West Qurna/ Basra/Iraq
Category Completed Project
Current Progress Completed 100%
Completion Date 2019

Mechanical Cleaning for static equipment at KAZ plant
Client Name Technip- BGC
Project Location Basra- Iraq
Category Completed Project
Current Progress Completed 100%
Completion Date 2019

Modular Building Installation Iraq West Qurna I (m095) Ds7 Isbl Water Injection System
Installation of prefabricated steel structural building for LCR ,The project is located in WQ1, the work includes but not limited steel structure installation, electrical work, cable try installation, HVAQ system installation, G&F system
Client Name Sajer / Saipem
Project Location West Qurna/ Basra/Iraq
Category Completed Project
Current Progress Completed 100%
Completion Date 2019

Supply and install of Scaffolds.
Providing various  required  Scaffolding along with required skilled manpower, Scaffolding materials. The scope will start from mobilization/ demobilization of skilled & experienced manpower, required scaffolding materials, equipments, tools & tackles to COMPANY site for erecting or dismantling of Scaffolding as per COMPANY Scaffolding procedures and permit requirements and the types of scaffolding is including but not limited to the following :
1. Supply and install Tube and Coupler cantilever scaffolding type.
2. Supply and Install Tube and Coupler suspendable scaffolding Type.
3. Supply and install Tube and Coupler mobile Scaffolding type.
4. Supply and install Tube and Coupler Tower scaffolds type.
Client Name Technip /BGC/ Shell
Project Location Khor Azubair Gas Plant - Basra - Iraq
Category Completed Project
Current Progress Completed 100%
Completion Date 2019

Installation of ME&I works at Zubair Oil Field
Installation of Mechanical, Electrical and Instrument works such as vessels, pumps, electrical panels, etc.
Client Name STX/SOC
Project Location Zubair Oil field - Basra- Iraq
Category Completed Project
Current Progress Completed 100%
Completion Date 2019

Hydro test and Pneumatic test at CPF
Hydro test and Pneumatic test at CPF
Client Name Petrofac
Project Location Badra Oilfield / Waset / Iraq
Category Completed Project
Current Progress Completed 100%
Completion Date 2018

Mechanical, Electrical and Instrument works.
Installation of Mechanical, Electrical and Instrument works such
1. Static Equipment Installation
2. Rotary Equipment Installation
3. Piping Installation
4. Valves Installation
5. Supports
6. NDT
7. Hydro-Test
8. Sand Blast
9. Painting
10. Flushing
11. Pre commissioning
12. Cable Installation
13. LV Transformer
14. ML Transformer
15. Electrical Equipment Installation
16. Electronic Equipment Installation
17. Power Panels
18. Power Generator Installation
Client Name Petrofac International (UAE) LLC .
Project Location Badra Oilfield—Waset—Iraq
Category Completed Project
Current Progress Completed 100%
Completion Date 2018

Fire Protection Concrete
Providing all the requirement and manpower to provide 125m3 + 175 m3 of Fire Protection Concrete
Client Name Albilal Company
Project Location Hamar Mushrif and Azubair Basra/Iraq
Category Completed Project
Current Progress Completed 100%
Completion Date 2018

Flow line and piping system for Gas compressor station
Fabrication, welding and installing flow line and piping system will all pipe fittings at Hamar Mushrif gas compressor station Basra - Iraq
Client Name BGC Shell - Iraq
Project Location Hamar Mushrif/ Basra/Iraq
Category Completed Project
Current Progress Completed 100%
Completion Date 2018

(FCP) Garraf Oil and Gas project in Nassriya
First Commercial and Production (FCP) Garraf Oil and Gas project in Southern Iraq. The project includes the EPC of storage tanks and the construction of piping systems, process units, LP & ATM. The current FCP Garraf project is designed for 100kbpd oil from the Mishrif formation utilizing two (2) oil processing trains of 50 kbpd capacity each.
Client Name Lakeshore Toltest Corporation
Project Location Nasrya/ Iraq
Category Completed Project
Current Progress Completed 100%
Completion Date 2018

Garraf Oil and Gas Project
The project is EPCC of the export pipeline for Garraf Contract Area to export the crude oil from the FCP at Garraf to Ahdep Pipeline which exports the crude oil further to the government depot at Nasseryah city.The project consists of 8km of 18" pipeline with the related facilities such as fiber optic, leak detection system, launching and recieving stations, 2 block valve stations and the required tie-ins.
Client Name Petronas Caligari Iraq Holding B.V.
Project Location Nasrya/ Iraq
Category Completed Project
Current Progress Completed 100%
Completion Date 2018

ME&I at Khor Azubai Gas Unit
Scope of Work in KAZ area as follow:
• Installation and hook-up of gas treatment facility.
• Erection of ME&I equipment and structures
• Tie-ins in gas treatment facility existing
• Interconnecting to gas treatment facility
• Installation of power and control cables.
• Installation of piping system with all insulation works.
Client Name KBR
Project Location Basra- Khor Azubair
Category Completed Project
Current Progress Completed 100%
Completion Date 2018

Al-Sabla of Lining Project,8Km
Design and construction of Al-Sabla canal of lining and the work is including, excavation, dewatering and pouring concrete
Client Name Ministry of Water Resource
Project Location Basra/Iraq
Category Completed Project
Current Progress Completed 100%
Completion Date 2017

Line Polyethylene Water Pipeline Network 14 Tamoz Street
Line Polyethylene water pipeline network in the 14 Tamoze street size 500 mm and 450 mm
Client Name Basra Water Directorate
Project Location Basra/Iraq
Category Completed Project
Current Progress Completed 100%
Completion Date 2017

Project to extend the pipeline to isolate a gas station
Fabrication, welding and laying pipe line with installing manifold and pipe fittings at Majnon Oilfield
Client Name Shell - Iraq
Project Location Alshamea -Basra
Category Completed Project
Current Progress Completed 100%
Completion Date 2017

Supply and Install H.V Electrical Equipment
The installation of 11KV, 22 KV and 33KV, substations. Our services also include CT, PT & LA, Isolators, gantries and towers
Client Name JCCI/Babil
Project Location Babil—Iraq
Category Completed Project
Current Progress Completed 100%
Completion Date 2017

Emergency Building in Azubair Hospital
Construction of Emergency building in Azubair Hospital in Basrah Governorate (2000m2) with 2 stories, this project including Excavation and filling, and concrete works for fundation, columes, slabs, … ( more than 2000m3 reinforced concrete)
Client Name Basrah support rebuild and services committee
Project Location Basra/Iraq
Category Completed Project
Current Progress Completed 100%
Completion Date 2017

Al –Shefaa Electrical Power Cable Project-Basra
Installation of a new electrical network by: Supply & installation of an over head line 200 circular & 38 lattice steel poles. Supply & installation of 10 transformers (Capacity 250KVA) with accessories
Client Name Mott MacDonald
Project Location Basra/Iraq
Category Completed Project
Current Progress Completed 100%
Completion Date 2017

Supply and install 4 unit of water treatment for Hay Al Hussain Water project
Supplying and install 4 units of water treatment for Hay Al Hussain Water project in Basrah , capacity of each unit is 400 m3/h
Client Name Basra Water Directorate
Project Location Basra/Iraq
Category Completed Project
Current Progress Completed 100%
Completion Date 2016

Bradhyaa Water Project
Maintenance and Widening Bradhyaa Water Project including supply and install different sizes of pipes, maintenance all water pumps, filters, valves and other works for project success
Client Name Basra Water Directorate
Project Location Basra/Iraq
Category Completed Project
Current Progress Completed 100%
Completion Date 2016

Supplying and install 4 unit of water treatment for Shat Al Arab Water project
Supplying and install 4 unit of water treatment for Shat Al Arab Water project in Basrah , each unit capacity is 400 m3/h 
Client Name Basra Water Directorate
Project Location Basra/Iraq
Category Completed Project
Current Progress Completed 100%
Completion Date 2016

Square Shooting
Design and construction of Square shoot for 10th battalion in Nasryah.
Client Name Corps of Engineers
Project Location Nasrya/ Iraq
Category Completed Project
Current Progress Completed 100%
Completion Date 2016

Rehabilitation of AL Garage P.S. and Sewerage Network.
Rehabilitation of al garage pump station and construction the Administration buildings, Service buildings and generator room ,Site works, Civil works for sewage collecting tank and Warehouse shed
Client Name Basra Sewer Directorate
Project Location Basra/Iraq
Category Completed Project
Current Progress Completed 100%
Completion Date 2016

Karmat Ali Sewerage Network & 2 Sewage Pump Station
Supply material, equipment and labors to construct a complete packaged sewage treatment plant and standby generator suitable for a population equivalent of 50,000 people as in the design drawings and the specification
Client Name Basra Sewer Directorate
Project Location Basra/Iraq
Category Completed Project
Current Progress Completed 100%
Completion Date 2016

Hay Al Hussain Sewerage Network
Supply material, equipment and labors to Excavation, supplying and Laying sewer network piping and manholes for Hay Al Hussain
Client Name Basra Sewer Directorate
Project Location Basra/Iraq
Category Completed Project
Current Progress Completed 100%
Completion Date 2015

Al Nwab Al Dubad Water Network
Supply and install difference size of pipes, Replace unsuitable materials, Reinstatement and other works for successfully finishing project.
Client Name Basra Water Directorate
Project Location Basra/Iraq
Category Completed Project
Current Progress Completed 100%
Completion Date 2015

Khor Al Zubayar Project
Design and construction of a pump system with piping for KHOR AL ZUBYAR harbor.
Client Name Iraqi Tankers Co.
Project Location Khor Al Zubair / Basra/ Iraq
Category Completed Project
Current Progress Completed 100%
Completion Date 2015

Majnon Pipe Line
Fabrication, welding and laying pipe line and pipe fittings at Majnon Oilfield – Basra - Iraq
Client Name Shell - Iraq
Project Location Majnon Oilfield – Basra - Iraq
Category Completed Project
Current Progress Completed 100%
Completion Date 2015

Al Shulah Sewage Pump Station Refurbishment
Supply material, equipment and labors to supplying and install (INLET CHAMBER , TRASH SCREEN, LIFTING CRANES, SUBMERSIBLE PUMPS, PIPING AND FITTINGS ) , including all necessary buildings and fences.
Client Name Basra Sewer Directorate
Project Location Basra/ Iraq
Category Completed Project
Current Progress Completed 100%
Completion Date 2015

Al Asmai Water Network Project
Install the water pipes network containing supply and install difference size of pipes, Replace unsuitable materials and other works for successfully finishing project
Client Name Basra Water directorate
Project Location Basra/ Iraq
Category Completed Project
Current Progress Completed 100%
Completion Date 2015

Rehabilitation of R-Zero Water Treatment Plant 10,000m3/hr
Rehabilitation of pumps, motors, generators, power and control cables, and electrical panels
Client Name Water directorate-Basra
Project Location Basra/ Iraq
Category Completed Project
Current Progress Completed 100%
Completion Date 2014

Al Meshraq Pipe Line Project
Design and construction of water pipe line at Al-Meshraq Area.
Client Name Mott MacDonald
Project Location Basra/ AlMeshraq
Category Completed Project
Current Progress Completed 100%
Completion Date 2014

West Quarna 1 Oilfield
Paving and repair of Al Tamimiyah Road ,including  excavation, filling, grading, compacting, leveling and paving with asphalt, of 10Km length. The works includes concrete works for intersections of 25cm depth and total 1400 m3.
Client Name Ministry of Municipalities and Public Works
Project Location Basra—Iraq
Category Completed Project
Current Progress Completed 100%
Completion Date 2014